Our well-equipped facilities and exceptional excellent control throughout all stages of manufacturing enables us to guarantee total buyer gratification for Factory directly sale Har-820 Whole Driving Injection Wholesale to Stuttgart, The product will supply to all over the world, such as: Turkmenistan, Turkey, European, Our products and solutions are widely sold to Europe, USA, Russia, UK, France, Australia, Middle East, South America, Africa, and Southeast Asia, etc. Our solutions are highly recognized by our customers from all around the world. And our company is committed to continually improving effectiveness of our management system to maximize customer satisfaction. We sincerely hope to make progress with our customers and create a win-win future together. Welcome to join us for business!
The decommissioned Reclaimer was relocated to a dedicated demolition area, away from any live plant. The machine was pulled from its stockyard, over a bridge and away from the live conveyor line. The machine was transported to a further designated area for demolition and processing.
Prior to moving the structure, Liberty Industrial disconnected and extracted the impact table from underneath the Reclaimer while it was in the stockyard, without damage to the conveyor belt. Once disconnected from all its services, the 1250t structure was pulled over purposely built extension rails to a temporary position where the machine underwent all preparatory works required for its transport using Self-Propelled Modular Trailers.
To pick-up and secure the Reclaimer in position during transport, a special-purpose 40t steel “transport frame” was fabricated and mounted on the bed of the SPMT trailers. Once lowered to the ground and secured, the structure was pre-weakened to facilitate its demolition with explosive cutting charges. The charges were placed at strategic locations and the pre-weakening cuts verified by our consulting structural engineer. After the structure had been safely collapsed to ground level, a combination of 70t & 36t excavators fitted with shear attachments processed the steel structure for removal and recycling off site.