Manufacturer for Har C216AL Mechanical Ice Cream Type Steel Chains to Estonia Factory
Manufacturer for Har C216AL Mechanical Ice Cream Type Steel Chains to Estonia Factory Detail:
More details:
Product detail pictures:
Assume full obligation to meet all demands of our customers; accomplish ongoing advancements by promoting the advancement of our customers; become the final permanent cooperative partner of clientele and maximize the interests of shoppers for Manufacturer for Har C216AL Mechanical Ice Cream Type Steel Chains to Estonia Factory, The product will supply to all over the world, such as: Hungary, Turkey, Lithuania, We always insist on the principle of "Quality and service are the life of the product". Till now, our solutions have been exported to more than 20 countries under our strict quality control and high level service.
To view additional machinery on our website click here: https://www.fraingroup.com.
Loma, Model IQ3, automatic, stainless steel, metal detector with number of product per minute – depending on materials and application. Total Aperture: 10¾” in Height; 21½” in Width. Sensitivity: 1.5mm Ferrous; 2.0mm Non-Ferrous; 2.0mm stainless steel – depending on application and envirment being run in. Equipped with 19¾” wide x 70″ long white Intralox product conveyor belt and ram air reject system. Control panel has touch pad controller with visual display. Mounted on a stainless steel (4) leg base frame.
OAD: 70″ L x 64″ W x 54″ H
This safety net was put up to protect the houses and the road below against falling ore from the ropeway conveyor syste, and the falling of the ropeway conveyor bins themselves. The net is made of chain-link wire mesh, tied on four 1 inch thick steel cables above the valley. It’s a beautifull view from up there especially the view of Hunedoara or Corvin’s castle. The road was about 30 meters or more below me. This net is situated near Corvin’s castle over the Zlaşti river valley. About the cableway: this cableway was made to transport iron ore from the ore proccessing facility at Teliucu Inferior to the Hunedoara’s steel mills. The entire ropeway conveyor system was 3 Km long, was shut down in 1999 than scrapped in 2003-2004. But they couldn’t scrap this net because of the houses below, and the costs of scrapping was higher than the value of the scrap recovered.

High production efficiency and good product quality, fast delivery and completed after-sale protection, a right choice, a best choice.
