75|RT During Steel Plant Shutdown



A Link-Belt 75-ton (70-mt) 75|RT rough terrain crane works during a steel plant shutdown in Columbia City, IN. During the shutdown, the 75|RT removed and replaced a steel chute.


Post time: Sep-08-2017

Send your message to us:

Write your message here and send it to us